Zhijiang Road Water Pipeline Corridor and Road Improvement Project (Zhipu Road - Fuxing Road) Third-Party Monitoring (Eastern Section) Project
The design scope of the Zhijiang Road water pipeline corridor and road improvement project extends from west of Zhipu Road to Fuxing Road in the east, with a total length of approximately 6.3 km. The construction content mainly includes the construction of a new water pipeline corridor and road improvement and renovation. The tunnel length is approximately 5.62 km, using a shield tunneling method, with an inner diameter of 13.3 m and an outer diameter of 14.5 m. A construction plan integrating pipelines, traffic, and landscaping is adopted, and the project will be implemented in two phases: Phase I includes the tunnel engineering, surface road engineering, water pipeline corridor engineering, and other ancillary works; Phase II includes the landscaping engineering.
Need Similar Testing Services?
With rich experience in engineering testing and professional qualifications, we provide you with fair and scientific testing solutions.